1) Three copies of a stake-out survey prepared by a licensed architect, engineer, or land surveyor are required. See site plan Standards below for specific requirements.
2) One set of building plans must be submitted. These plans must include the floor plans with all dimensions, wall sections, elevations, electrical, plumbing, HVAC, structural member materials (ceiling and floor joists, beams, and roof rafters) to include spacing, spans, sizes, grade, and species of lumber to be used.
3) A building permit application must be filled out and submitted with the stake-out survey and building plans mentioned above.